Project

Meadowview

Construction of a soil nail lateral support wall for the Meadowview Site 14 excavation, comprising drilled and grouted TB500 soil nails, reinforced shotcrete facing, and drainage systems to stabilise the excavation.

P003 meadowview lateral support 10 access road along wall angled view

Gauteng

Johannesburg

Project year

2025

Project type

Lateral Support

Photo gallery

Equipment used

>425CFM Compressor;

Casagarande B125;

Furukawa Drill Rig PCR200;

Similar projects

Drilling
Testing & Analysis

Franschhoek Pass

Geotechnical slope stabilisation works along Franschhoek Pass (R45) at km 28.1–28.2 to repair flood-damaged sections of the roadway and stabilise the adjacent embankment.
Franschhoek pass b01 010 drilling

Similar projects

Drilling
Testing & Analysis

Bloemendal to Piet Retief

Slope stabilisation works at the substation site, including installation of rock bolts, galvanised wire mesh, and shotcrete to stabilise steep rock slopes. Drainage measures are incorporated to manage groundwater and prevent erosion.
P047 bloemendal piet retief b01 002 drill rig site wide

Similar projects

Drilling
Anchor Installation

28 Somme Road

Lateral support works at 28 Somme Road, involving surface preparation and the installation of flush gunite to stabilise the excavation face and provide temporary support to the exposed ground during construction activities.
28 somme road b01 019 lateral support site detail mid

The process of working with us

From first brief to final sign-off, our process is built to remove uncertainty. We plan the right scope, deliver clear findings, and support you through construction so your programme stays predictable and your risk stays controlled.

1.Scope & Understand

We start by understanding the project goal, constraints, programme, access, and risk profile (drawings, location, ground history, services, environmental constraints).

2. Proposal & Method

We define the investigation / scope of works and issue a clear proposal: methodology, equipment, H&S requirements, deliverables, timeline, and cost.

3. Plan & Mobilise

We handle practicalities before arriving on site: permits, wayleaves, traffic accommodation (if needed), utility checks, H&S files, and mobilisation planning.

4. Site Investigation & Testing

We execute the fieldwork (e.g., drilling, test pits, SPT/CPT where applicable, sampling), plus on-site testing and chain-of-custody to the lab.

5. Engineering Analysis & Design

We interpret the ground model and convert data into decisions: parameters, stability/settlement checks, founding recommendations, support requirements, and constructability.

6. Reporting & Implementation Support

We deliver the final report/design pack and remain involved during construction: clarifications, site support, QA/verification testing, and sign-off documentation.

Need more assistance?